Giant rock moved

Staff needed a helping hand to install a giant rock in the Barbary sheep enclosure.

dzg_barbary_rock_web

Assistant Curator, Richard Brown, said: “A mechanical digger was brought in to shift a 1.5 tonne rock from the lower site to the upper level and also moved a load of sand to the adventure playground at the same time.   “The rock will provide enrichment for the Barbary sheep.”   dzg_barbary_rock_web